首页 > 高职专科
题目内容 (请给出正确答案)
[主观题]

This Contract shah remain ______ force until terminated______ either party by giving a written notic

e ______ least 90 days______ advance to the other party ______ registered airmail.
查看答案
答案
收藏
如果结果不匹配,请 联系老师 获取答案
您可能会需要:
您的账号:,可能还需要:
您的账号:
发送账号密码至手机
发送
安装优题宝APP,拍照搜题省时又省心!
更多“This Contract shah remain ____…”相关的问题
第1题
within, for, between, out, in, forward, to, with, by, atTerms in Technical Contract The Buyer agree

within, for, between, out, in, forward, to, with, by, at

Terms in Technical Contract

The Buyer agrees that the Seller will carry(1)the design, selection of material manufacturing, inspection and test of the equipment and materials supplied by the Seller according(2)the existing standards and codes of the Seller' s country. (3) one and a half months after signing the Contract, the Seller shall airmail(4)his own expense to the Buyer the said standards and codes(5)six copies.These documents shall be delivered in English as far as possible and the rest in German.The standards and codes shall be with indication of item numbers of the equipment and materials.The Buyer shall put(6)his comments(7)reference to the submitted standards and codes during the preliminary design meeting and the final agreement reached

(8)both parties through discussion shall be regarded as the basis for the inspection and test of the equipment and materials.

All the equipment and materials supplied(9)the Seller shall be inspected by the Seller and quality certificates and inspection and test records shall be issued by the manufacturers or the Seller.These documents shah be delivered to the Buyer as certificates of quality guarantee in accordance with the Contract.All expenses involved in the inspection and test of the equipment and materials shall be(10)the Seller's account.

点击查看答案
第2题
The Seller shah not be held responsible ______ late delivery or non-delivery of the goods owing ____
__ generally recognized Force Majeure causes.
点击查看答案
第3题
The date of ______ of the Joint Venture Company shah be the date of the establishment of the board o
f directors of the Joint Venture Company.

A.register B.registration C.registries D.registrant

点击查看答案
第4题
A commission of 8 percent shah be offered on all sales of manufacture's products within the abov
e-mentioned territories even in cases ______ manufacturer sells them directly or where such sales are made by any other person or firm, for shipment to the said territories.

A.if B.that C.which D.where

点击查看答案
第5题
Application for insurance a.Please cover us on the goods detailed below./Please insure us on the fo

Application for insurance

a.Please cover us on the goods detailed below./Please insure us on the following.

b.We ask you to insure our goods for US $10000 against All Risks with the ABC Insurance company.

c.We are desirous of insuiring a consignment of cotton products against All Risks.

d.Please insure the goods at the invoice value plus 10% as usual.

e.We shah be glad if you will cover insurance against All Risks, warehouse to warehouse, from Hong Kong to San Francisco.

点击查看答案
第6题
What is contract?
点击查看答案
第7题
Breach of contract
点击查看答案
第8题
to tear up the contract
点击查看答案
退出 登录/注册
发送账号至手机
密码将被重置
获取验证码
发送
温馨提示
该问题答案仅针对搜题卡用户开放,请点击购买搜题卡。
马上购买搜题卡
我已购买搜题卡, 登录账号 继续查看答案
重置密码
确认修改